HIGH-PERFORMANCE CENTRE
In short, a new municipal sports facility dedicated to high-level physical preparation!
330M² OF HIGH PERFORMANCE
A new sports facility was delivered in spring 2024 to complete the range of sports on offer at the Municipal Stadium.
A weight room connected to all the existing facilities, with weights, machines, cryotherapy, computerised performance monitoring and everything else needed for top-level physical preparation.
“Equipment has been purchased and other state-of-the-art equipment has been leased so that we can stay as close as possible to innovations. The site was inaugurated at the end of April 2024 for the visit of the Olympic champion French 7-a-side rugby team, to prepare for its Olympic tournament in our seaside town.” emphasised Louis Galdos, Mayor of Capbreton.